With just two weeks until the grand opening of Bradley’s Sports Bar, work is gathering pace inside the West Stand at Mill Farm.
The huge 60″ TV screens have been installed today and are ready to be programmed together whilst the lighting tracks on the ceiling have been completed.
The slate floor tiling through the centre of the bar is finished and the oak timber flooring throughout the rest of the bar is underway.
The floor in the toilets has been tiled and the plastering of the walls is complete. The resin flooring through the kitchen is done and will be completed behind the bar over the weekend.
The white granite top has been installed at the coffee bar in Aroma cafe and the black granite surface at the back of the bar in Bradley’s is also in place.
Glazing has started to the main entrance of the West Stand and the block paving outside the front of the stand is well underway, as seen below.
Inside the entrance lobby the impressive spiral staircase that runs right up to the second floor is being fitted.
Externally the AFC Fylde signage is up on the pitch side of the stand, along with the giant clock in the centre!