Mill Farm has been a hive of activity this week with less than a month until the grand opening of Bradley’s Sports Bar!

The bar itself in Bradley’s has been electrically fixed and the bulkhead above the bar has been installed.

The first fix of plumbing of all the toilets on the ground floor of the West Stand has been done, whilst plastering has moved onto the first floor.

The bulkhead of the spiral staircase in the entrance to the stand has been installed and scaffolding has been cleared at the front ready for the block paving.

Glazing to the pitch side elevations has begun and the air handling plant has been lifted onto the roof.

The weather has been kind this week and pitch drainage and irrigation is 90% complete. The rootzone carpet (a blend of soil and fertiliser) is due to go down next week.